The Viraport® Journey Timeline

  1. March 11, 2020: Covid 19 is declared a pandemic.
  2. May 2020: Concept Work begins on our yet unnamed product.
  3. June 2020: Progress on project warrants filing for Viraport Trademark with US Patent Office.
  4. August 2021: Ongoing Development Advances and additional features are considered and added as required.
  5. May 10, 2021: Received TM Acceptance from US Patent Office as Viraport®
  6. July 2021: Ongoing Engineering, Development & Testing Continues on an accelerated schedule.
  7. July 2021: Viraport® Android App is developed to provide notifications as to the Calculated Exposure (AQS) of potential threats in a monitored room.
  8. August 2021: Ongoing Development Advances and additional features are considered and added as required.
  9. Viraport® App is enhanced to control the Viraport® settings.
  10. November 2021: Viraport® (Model A) Prototype placed in service for real time stress testing.
  11. January 2022: Work begins on MODEL B-22 utilizing the initial designs and perfecting various elements to eliminate bugs and apply remedies, in order to improve the Viraport® product.
  12. March 2022: Ongoing testing and advanced optimization of the source code to provide consistant results.
  13. August 2022: Additional research conducted to add OPC virus sensor capabilities for particulates.
  14. September 2022: Automatic Ventilation relays are added to System.
  15. December 2022: Added Temperature and & Humidity control relays to System.
  16. June 2023: OPC Virus sensors obtained and intefgreted into the System.
  17. July 2023: Viraport® IOS App is scheduled for development.
  18. August 2023: Preparations for introduction of the Viraport® System continue.
  19. September 2023: Tentative Viraport® product launch.

The Viraport® Journey Timeline

  1. March 11, 2020 Covid 19 is declared a pandemic.
  2. May 2020 Concept Work begins on our yet unnamed product.
  3. June 2020 Progress on project warrants filing for Viraport Trademark with US Patent Office.
  4. Ongoing Development Advances and additional features are considered and added as required.
  5. May 10, 2021 Received TM Acceptance from US Patent Office as Viraport®
  6. Ongoing Engineering, Development & Testing Continues on an accelerated schedule.
  7. Nov 2021 Viraport® (Model A) Prototype placed in service for real time stress testing.
  8. Jan 2022 Work begins on MODEL B-22 utilizing the initial designs and perfecting various elements to eliminate bugs and apply remedies, in order to provide an invaluable product to the general public.
  9. Jan 2022 Preparations are in progress to procure components & increase manufacturing capabilities.
  10. Marketing strategies are being formulated to coincide with the initial product release.
  11. May 2022 The development of Model B-22 is scheduled to be completed.
  12. June 2022 Manufacturing is scheduled to commence.
  13. Aug - Sept 2022 Initial orders to be shipped.
Page 11

INNOVATION FOR A BRIGHT FUTURE

Here at Ameri-Brand, we can’t possibly fathom all the ways that these products can be used because they’re that versatile. So help us out! CLICK HERE to give us feedback on what ways you think these products could be used or improved. Or, maybe you’re interested in funding the development of these products, in which case, CLICK HERE!